From Junction Hut to Peter Muir Bridge via Timaru River Track
View
Distance: 4.3 km
(2.0 DOC hours)
- Marked route
- Easy-moderate terrain
Altitude: 362m to 456m. Gain: 24m. Loss: 118m . Gradient: 2 deg (Gentle)
Skills: - Occasional rivers (3/6)
Altitude: 362m to 456m. Gain: 24m. Loss: 118m . Gradient: 2 deg (Gentle)
Skills: - Occasional rivers (3/6)
GPX info source: Drawn on map
From Deer Spur creek, continue down the shingle flats of Timaru River, crossing as required, for 1.5km before picking up the start of a poled route on the southern bank where flats end. The route sidles low to the river, crossing multiple times - often in steep fast sections that can be impassable after rain. If the river is up, then use the alternative high water 4wd track which can be intersected sidling 200m above the river on the northern valleyside.
1-2hrs
Created by: Madpom on 2019-07-31. Experienced: 2019-01-20
Links: Add / edit links
Route segments connecting with this one:
Places you can go from here:
Mae West Biv (Hut)
(4 routes
Moonlight & Roses Hut (Hut)
(3 routes
Top Timaru Hut (Hut)
(4 routes
Trips passing through here:
Comments:
Add
You are not currently signed in. Please register to comment