From Arawaru.Trk / Main Range Rt Jn to Platinum Mines / Quartz Creek track Jn via Quartz Creek Track
View
Distance: 3.2 km
(1.5 DOC hours)
- Marked route
- Easy-moderate terrain
Altitude: 184m to 617m. Gain: 79m. Loss: 505m . Gradient: 11 deg (Moderate)
Skills: - Streams (2/6)
Altitude: 184m to 617m. Gain: 79m. Loss: 505m . Gradient: 11 deg (Moderate)
Skills: - Streams (2/6)
GPX info source: Uploaded from GPS
From the track junction, continue north a further 400m to pt624 along the roughly-marked route. At pt624 bait station and track maintenance commence, and a well-marked, well cut route continues north, dropping steeply to the Quartz Creek confluence. Crossing Quartz Creek (ankle deep, but could flood in extreme conditions), a good, benched, walking track commences, leading a further 300m to join the Sledge Track at a signposted junction.
Created by: Madpom on 2015-06-20. Experienced: 2013-02-25
Links: Add / edit links
Route segments connecting with this one:
Places you can go from here:
Arawara Highpoint (Summit)
(12 routes
Ballance Reserve (Locality)
(10 routes
Black Bridge (Roadend)
(10 routes
Burn Hut (Hut)
(11 routes
Burttons Track (west end) (Roadend)
(15 routes
Mangahau No2 Reservoir (Roadend)
(14 routes
Patupaiareha Saddle (Pass)
(9 routes
Pretender (Summit)
(3 routes
Punga camp (Hut)
(14 routes
Scotts Road roadend (Roadend)
(11 routes
Wharite Peak (Roadend)
(4 routes
Woodville (Locality)
(7 routes
Trips passing through here:
Comments:
Add
You are not currently signed in. Please register to comment